Sjørutene

Suez, Panama and the Arctic routes – the passages world trade runs through

Suez, Panama and the Arctic routes explained: why a few narrow places decide world trade, what Panamax and Neopanamax mean, why drought stops ships in Panama, and what the detour around Africa actually costs.

Back to the episode Arrow keys or swipe

What this covers

  1. Why a handful of places decide so much
  2. Suez – the canal without locks
  3. Panama – the canal that runs on fresh water
  4. Panamax and Neopanamax, and what the dimensions mean
  5. Arctic routes, and what actually limits them
  6. The detour around the Cape of Good Hope
  7. What a blocked route costs

What this covers (cont.)

  1. How to read the news about this

Why a handful of places decide so much

A ship can go almost anywhere. It is the land in between that forces it through particular points.

Without Suez goods between Asia and Europe have to go around the whole of Africa.
Without Panama goods between Asia and the US east coast have to go around South America, or be unloaded and carried overland.
The consequence: two canals built more than a century ago still decide what things cost in a shop in Norway.

Suez

The Suez Canal opened in 1869 and links the Mediterranean to the Red Sea. Its most important technical feature is something it does not have: locks.

Panama

The Panama Canal opened in 1914 and links the Atlantic to the Pacific. It is shorter than Suez, but technically far more complicated, because it does not run at sea level. Ships are lifted up to a lake, cross it, and are lowered again.

Why Panama is vulnerable in a completely different way

  1. The ship is lifted in locksUp to Gatún Lake, which sits well above sea level.
  2. Every lock operation uses fresh waterThe water runs out to sea when the ship is lowered again.
  3. The water comes from rainfallThe lake is filled by rain in the surrounding watershed.
  4. Drought becomes a capacity limitLess rain means fewer transits per day, and a lower permitted draft.
This is the most counterintuitive thing in the episode. Panama's constraint is not space, and not demand. It is water. The same canal can take far fewer ships in a dry year than in a wet one, with nothing physically changed – and the canal competes for the same water as the country's drinking supply.

Panamax and Neopanamax

Because the locks have fixed dimensions, the Panama Canal has given its name to a whole class of ship. A vessel is not built larger than the canal it has to pass.

Two generations of locks

Panamax

The original locks

  • Dimensions from the works that opened in 1914
  • Defined ship size for generations
  • Still in use

Neopanamax

The 2016 expansion

  • Up to 370.33 metres length, from May 2021
  • Up to 51.25 metres beam, from June 2018
  • Draft up to 15.24 metres, depending on water level
  • Normal capacity 9–11 vessels a day
Note that the dimensions have been revised upwards several times since the 2016 opening. That is not because the locks were rebuilt, but because operating experience made fuller use of them defensible. And note the draft: it is given as "depending on water level", which is exactly the point from the previous figure.

The Arctic routes

It is worth separating two things that often get conflated here: the Northern Sea Route north of Russia, and the Northwest Passage through the Canadian archipelago.

Why shorter is not the same as better

ObstacleWhat it means in practice
IceThe route is not open year-round, and ice conditions vary from year to year.
Ship classOrdinary container ships are not ice-strengthened. It takes purpose-built, more expensive vessels.
EscortIcebreaker escort costs money, and has to be planned.
InsuranceHigher risk means higher premiums, and some underwriters will not cover it.
Emergency responseLong distances to port, little infrastructure, and an environment where a spill is extremely hard to clean up.
PredictabilityContainer lines sell fixed sailings. A route that varies with the ice suits liner traffic badly.
The last point is the most commonly underestimated. Liner shipping is not about being fastest once, but about being able to promise the same arrival day every week, all year. A route that is three weeks faster in summer and closed in winter does not solve that problem – it creates it.

The detour

When a main route cannot be used, alternatives exist. They are simply expensive in a way that is not obvious.

What happens when ships have to go around Africa

  1. The voyage gets longerSeveral extra weeks on Asia–Europe, and more fuel per trip.
  2. Ships are occupied for longerA ship on a detour is out of the market for that extra time. The fleet shrinks without a single vessel disappearing.
  3. Capacity tightensFewer available ships against the same demand raises freight rates – including on routes that are not affected.
  4. Schedules slipPort calls shift, containers end up in the wrong place, and empties pile up where they are not needed.
Step two is the key, and the one that explains why a disruption in one place raises prices everywhere. The effect is not that the route becomes more expensive. The effect is that total transport capacity in the world becomes smaller, because every ship spends longer on every trip.

How to read the news about this

Always ask what the binding resource is.

In Suez: width, depth and traffic management.
In Panama: fresh water.
In the Arctic: ice, season and predictability.
And in the market as a whole: how many ship-weeks are available – not how many ships exist.

What is worth taking with you

That sea transport is cheap over distance, but vulnerable at a few narrow points.

Key points

  • Sea transport is cheap over distance, but vulnerable at a few narrow points.
  • Suez has no locks. Panama has locks, and they consume fresh water.
  • Panama's constraint is water, not space – drought reduces the number of daily transits.
  • The Neopanamax locks take vessels up to 370.33 metres long and 51.25 metres wide.

Key points (cont.)

  • Arctic routes are shorter in distance, but limited by ice, season, escort and insurance.
  • The detour around the Cape adds weeks, and ties up ships that then disappear from the market.
  • A route closed for some is more expensive for everyone.

Questions this answers

  • Why are Suez and Panama so important?
  • What is the difference between the two canals?
  • What do Panamax and Neopanamax mean?
  • Why does drought limit the number of ships through Panama?
  • How much shorter is the Arctic route?
  • Why is the Northern Sea Route not used more?

Questions this answers (cont.)

  • What happens when ships have to go around Africa?

Sources

  • Panama Canal Authority – Discover the Expanded Canal
  • Panama Canal Authority – Panama Canal Extends Maximum Length Overall and Increases Draft for Neopanamax Locks
  • Panama Canal Authority – measures to address reduced precipitation in the canal watershed

Spørretimen

Read the whole thing at

www.sporretimen.no/en/episodes/sjoruter-suez-panama-arktis/